logo

Slab Shoring Formwork For Concrete Slab Form of Steel Beams

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


Top/Base Beam - PLYTEC

BASE BEAM is a multi-purpose modular shoring system for concrete construction. It is made of high strength galvanized steel and has high durability and reusability. The system requires minimal components to achieve any shoring configuration, to support various formwork for columns, walls, beams, slabs, or bridges.

TITAN Formwork

TITAN Formwork Systems is committed to equipping builders to succeed by providing the lightest, safest and most versatile framing system in its class.With the cutting-edge TITAN HV, TITAN MAX and TITAN XL concrete shoring systems, TITAN's flexible, handset and modular slabforming equipment can support your heaviest and most detailed projects, and is available for sale or rental.

Horizontal Shores / Adjustable Beams | Ellis Manufacturing

Horizontal Shore quickly adjusts from 3'.7" to 6' (HS.46), 6' to 10' (HS.610), 8' to 13' (HS.813) to support formwork for concrete. Ellis Horizontal Shores are also known as spanalls, quick beams, adjustable beams.

Aluflex Slab Formwork System | Formwork

The Aluflex system is a high load capacity formwork system for the support and forming of suspended concrete slabs. The systems basic components are the Alulight Multiprop, the Aluflex 105 Bracing Frame with primary and secondary beam options. The primary beams being secured to the prop heads with steel clips or held in a steel fork head.

Horizontal Shores / Adjustable Beams | Ellis Manufacturing

Horizontal Shore quickly adjusts from 3'.:7". to 6'. (HS:46), 6'. to 10'. (HS:610), 8'. to 13'. (HS:813) to support formwork for concrete. Ellis Horizontal Shores are also known as spanalls, quick beams, adjustable beams.

Types of Formwork (Shuttering) for Concrete Construction and

Figure .3. shows the formwork for the beam and slab floor. As shown in the fig the slab is continuous over a number of beams. As shown in the fig the slab is continuous over a number of beams. The slab is supported on 2.5 cm thick sheathing laid parallel to the most beams.

Slab Formwork System - Concrete Slab Forms |

Modular and beam formwork| and aluminium forms for concrete slab construction: All kinds of applications are covered: large slabs| solid and lightened| inclined| drop beams| infillings| column heads| cantilever beams etc: Excellent concrete finishes and safety standards guaranteed for workers: ×

Formwork |

Econo:Form; sometimes also referred to as Economy:Form; is a steel faced wall formwork system used for both straight and curved walls. Econo:Form Multi:Form Beams combined with Plywood and Walers provides a versatile wall forming system for both straight and curved walls.

WHEN TO REMOVE CONCRETE FORMWORK? -

Type of Form: Removal Time Period: Walls. columns and vertical sides of beams: 24 to 48 hours as may be decided by the engineer-in-charge. Slabs (props left under) 3 days: Beam soffits (props left under) 7 days: Removal of props to slabs (Spanning upto 4.5 m) 7 days: Removal of props to slabs (Spanning over 4.5 m) 14 days