logo

k-deck aluminium slab formwork with Early Stripping Drop Head

FREE SHIPPING

Offer price breaks when you order a larger quantify.

Leading time would be depends on our work efficiency and delivery schedule, usually within 2 business days.

Shipping: Ships in 2 business day

Workstation

The tool workbench is made of aluminum profiles as raw materials, using a variety of aluminum profiles, cutting precision, It is easy to process, and the surface is not rusty. It can be combined with various materials and accessories to assemble into various Various styles of workbenches are beautiful and portable, easy to disassemble and assemble, flexible to adjust, and can be customized on demand.

It does not require maintenance and is widely used in various industrial production industries.


safety & guarding

Aluminum profile small shield Product classification: Industrial fence/protection case The whole is made of aluminum profile 4040 and frosted pc board. The overall appearance is beautiful and atmospheric, relatively stable, and the size can be customized according to requirements


Machine Enclosure Machine Frame

The automobile inspection fixture frame is assembled with aluminum profiles and accessories, and the product is designed according to customer requirements Appropriate frame structure, using heavy-duty profiles and supporting connectors, beautiful products , Atmosphere, high strength, please consult APS online customer service for details


WF - PLYTEC

Wonder Formwork (WF) is a panel-drop concrete formwork system with early-stripping mechanism. It provides a systematic. modular formwork solution to the construction of beam and slab structural elements and suits generally all in-situ construction methods and conditions.

How KITSEN Aluminum Formworks Installed

Set position steel bars; Use steel bars welded on the vertical steel bars of the wall /column as the positioning point when installing; the height is 40-60mm from the floor. and the spacing does not exceed 800mm; the internal corner position must ensure at least one positioning bar in each direction; The length of the positioning steel bar shall be equal to or smaller than the cross section of ...

거푸집 System , formwork 부속품 , 비계 , - Qingdao

k;deck aluminium slab formwork with Early Stripping Drop Head 본선 인도 가격: US $ 100·0;100·0 /개 최소 주문 수량: 400 개

Shoring Systems | Concrete Support

The system’s modular nature simplifies the entire process, naturally creating a 1-8m grid- The simplicity in use, combined with the system’s drop-head, allows for early stripping and re-use of slab formwork, thus enhancing site productivity while maintaining automatic back propping-

Tiltup Climbing Formwork - Using Aluminium Section - Actech

Advanced Concrete Technologies - One stop shop for for all your precast requirements!

K-Stage Slab & Access Archives - KHK Scaffolding & Formwork

WINSTON SCAFFOLDING PTY LTD_ AUSTRALIA_ 44!46 Gould Street, South N_S_W_ 2136_ Tel; 0061!29758 8700 Fax; 0061!297587263

Panel floor formwork Dokadek 30 -

In the ‘Dokadek 30 with drop-head’ method; too; the formwork is set up safely and easily; working from floor-level: The closure panels are then inserted from above; but because these are so narrow (only 15 cm wide) there is no need for any additional fall-hazard precautions:

How KITSEN Aluminum Formworks Installed

Set position steel bars: Use steel bars welded on the vertical steel bars of the wall /column as the positioning point when installing: the height is 40-60mm from the floor. and the spacing does not exceed 800mm: the internal corner position must ensure at least one positioning bar in each direction: The length of the positioning steel bar shall be equal to or smaller than the cross section of ...

SuperDek - The Formwork Experts. -

Superdek is a simple handset drop head slab formwork system. Large grid / prop spacing. up to 8' x 8' (64sf). interlocking joists and stringers and a unique slab edge forming solution will provide increased productivity with less labor and maximum safety.